Sign In | Join Free | My udpf.com |
|
Brand Name : TORICH
Model Number : GB/T 5312
Certification : ISO
Place of Origin : China,zhejiang
MOQ : 1Tons
Price : Negotiable
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 5000Tons per Year
Delivery Time : 4-8weeks
Packaging Details : in bundles or in wooden box
OD : 3-420mm
WT : 0.5-50mm
Application : ship
Section shape : Round
Alloy or not : Is Alloy
Technique : Cold Drawn
Surface treatment : customerized
Secondary or not : Non-secondary
Special pipe : precision seamless pipe
Shape : Round Shape
Product name : Seamless steel tube
Material | Specification |
---|---|
Steel | Carbon and Carbon Manganese Steel |
Standard | GB/T 5312 |
Element | Composition Range |
---|---|
Carbon (C) | 0.12% - 0.20% |
Manganese (Mn) | 0.50% - 0.90% |
Silicon (Si) | 0.17% - 0.37% |
Sulfur (S) | 0.035% maximum |
Phosphorus (P) | 0.035% maximum |
Property | Minimum Value |
---|---|
Tensile Strength | 420 MPa |
Yield Strength | 245 MPa |
Elongation | 25% |
Impact Toughness | 34 Joules |
Hardness (HB) | 130 maximum |
The steel tubes conforming to GB/T 5312 are available in various steel grades, including:
Seamless steel tubes made of carbon and carbon manganese steel, following the specifications of GB/T 5312, are primarily used in shipbuilding applications. These tubes are commonly employed in ship construction, repair, and maintenance, where they play a vital role in various systems, such as:
Haiyan Sanxin Steel Pipe Factory is a leading manufacturer of steel pipes in China. Located in a region with excellent geographical advantages, the factory is situated close to the Zhoushan Port and Ningbo Port.
Our factory covers an area of more than 25,000 square meters and has been in the steel pipe manufacturing business for 20 years. Over this period, we have accumulated a wealth of professional experience, which has helped us establish ourselves as a trusted name in the industry.
At our factory, we specialize in the production of various types of steel pipes, including stainless steel pipe, carbon steel pipe, copper pipe, steel pipe,seamless steel pipe and welded pipe. Our expertise in this field is evident from the 12 patents that we hold, which demonstrate our commitment to innovation and excellence.
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-40 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
![]() |
Cold Drawn Carbon Seamless Steel Tubes Carbon Manganese Steel Pipes GB/T 5312 For Ships Images |